1 Replacing Synergy Manager Bracket Replacing Synergy Manager Wall Mounting Corrosion Protective Bracket Instructions This manual describes how to replace a wall mounting corrosion protective bracket of Synergy Manager. Figure 1: Three Phase Inverter with Synergy Technology NOTE The Synergy Manager weighs 18 Kg. SolarEdge recommends two people remove the Synergy Manager from the bracket. Kit…
1 Communication Board Replacement in Three Phase Inverters Kit Contents Communication board Required Tools 5mm hex key Torque Philips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to…
07/2019/V1/ENG ROW solaredge.com | info@solaredge.com Case Study The company, a leader in high-reliability design, manufacturing and supply chain solutions, decided to reduce electricity costs in their Thailand factory by installing a rooftop solar system. After installing 1MW rooftop with traditional string inverters, they decided to switch to SolarEdge’s optimized solution, for their second,…
Case Study The Challenge When Shinfox Power renewable energy investment firm decided to finance one of the largest utility- scale PV plants in the world, they searched for a PV system with the maximum energy output and the lowest operating costs, to secure the highest long-term return on their investment. Shinfox Power, a subsidiary of the Foxlink group, develops, constructs and provides O&M…
Case Study The Challenge Alta Plastic Ltd. is a leading manufacturer of biodegradable plastic packaging products and food pouches, exporting to Asia, Europe, Australia, and North America. The manufacturing facility located in Ho Chi Minh City, Vietnam, uses energy-intensive machinery that consumes approximately 300MWh of power each month. To reduce their high electricity costs, the plant decided…