07/2019/V1/ENG ROW solaredge.com | info@solaredge.com Case Study The company, a leader in high-reliability design, manufacturing and supply chain solutions, decided to reduce electricity costs in their Thailand factory by installing a rooftop solar system. After installing 1MW rooftop with traditional string inverters, they decided to switch to SolarEdge’s optimized solution, for their second,…
Case Study The Challenge When Shinfox Power renewable energy investment firm decided to finance one of the largest utility- scale PV plants in the world, they searched for a PV system with the maximum energy output and the lowest operating costs, to secure the highest long-term return on their investment. Shinfox Power, a subsidiary of the Foxlink group, develops, constructs and provides O&M…
Case Study The Challenge Alta Plastic Ltd. is a leading manufacturer of biodegradable plastic packaging products and food pouches, exporting to Asia, Europe, Australia, and North America. The manufacturing facility located in Ho Chi Minh City, Vietnam, uses energy-intensive machinery that consumes approximately 300MWh of power each month. To reduce their high electricity costs, the plant decided…
01/06/2022 לחוק ב6סעיף בהתאם ל 2021בע"מ לשנה קלנדרית סולראדג' טכנולוגיותשל חברת ומבידו"ח פ 1996 –, תשנ"ו שכר שווה לעובדת ולעובד לחוק השלישית לתוספת 3 – 1 יםפרט מספר סידורי של קבוצת 1העובדים פער השכר בקבוצה לפי שכר קובע לפיצויי 2פיטורים פער השכר בקבוצה לפי שכר ברוטו למס שיעור העובדות בקבוצה ששכרן נמוך מהשכר הממוצע בקבוצה שכר ברוטו למס - שיעור העובדים בקבוצה ששכרם נמוך מהשכר -…