1 Communication Board Replacement in Three Phase Inverters Kit Contents Communication board Required Tools 5mm hex key Torque Philips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to…
1 Three Phase Residential Solution for Australia, System Design and Installation Guidelines Version History 1.0 - initial release 1.1 - modified design guidelines and figure 1. 1.2- changed pictures in the Design Guidelines section. 1.3 - added P505 power optimizer to PV Array Length in Design Guidelines 1.4 – added note regarding design guidelines 1.5 - July 2019 – replaced image of inverter…
For Australia Version 1.1 Three Phase Inverter with SetApp Configuration PN: SEXXK-AUXXIXXXX Quick Installation Guide 1. Turn ON/OFF/P Switch to OFF (0) 2. Turn Safety Switch to OFF 3. Open cover screws Fasten screws in described order NOTE Turn ON/OFF the main circuit board AC switch, and wait 5 minutes Torque value LEDs Legend Do not cut cable connectors Inverter ON/OFF Switch: 0=OFF; 1=ON; P=…
Apr. 2018 Replacing an Inverter Module of the Three Phase Residential and Commercial PCE Note: SolarEdge replaceable inverter modules are mechanically interlocked with the DC Switch Disconnector, located within the DC Safety Unit section. 1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe (