solaredge.com SolarEdge Home Load Controller Model: DCS Optimize energy consumption by controlling appliance usage Controls permanently connected appliances Includes two controlled dry contact switches Switches larger single and three phase loads via an external contactor Wireless connection to the inverter via SolarEdge Home Network Increases savings by maximizing self-consumption through…
1 Communication Board Replacement in Three Phase Inverters Kit Contents Communication board Required Tools 5mm hex key Torque Philips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to…
1 Replacing Synergy Manager Bracket Replacing Synergy Manager Wall Mounting Corrosion Protective Bracket Instructions This manual describes how to replace a wall mounting corrosion protective bracket of Synergy Manager. Figure 1: Three Phase Inverter with Synergy Technology NOTE The Synergy Manager weighs 18 Kg. SolarEdge recommends two people remove the Synergy Manager from the bracket. Kit…
1 Three Phase Residential Solution for Australia, System Design and Installation Guidelines Version History 1.0 - initial release 1.1 - modified design guidelines and figure 1. 1.2- changed pictures in the Design Guidelines section. 1.3 - added P505 power optimizer to PV Array Length in Design Guidelines 1.4 – added note regarding design guidelines 1.5 - July 2019 – replaced image of inverter…