Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Version 1.2, May 2018 Application Note – Alternate Current Transformer Selection, North America Version history Version 1.2, April 2018 – product name change from "SolarEdge Electricity Meter" to "Energy Meter" Version 1.1, January 2018 – clarified CT compatibility requirements and added CT options Version 1, October 2017 – initial version Introduction The Energy Meter (refer…