Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
`1 2 B. Instale el interruptor termomagnético 3 Apagado Panel de servicio principal 1 5 Apagado 2 El interruptor del conmutador principal se aplica solo al modelo BI-E Apagado 3 17 in*lb 23 in*lb 6 A. Apague el sistema y abra la interfaz de respaldo Instalación del interruptor termomagnético del inversor para conectar un inversor adicional en la interfaz de respaldo (modelos BI-N y BI-E) PELIGRO…