Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
1 Communication Board Replacement in Three Phase Inverters Kit Contents Communication board Required Tools 5mm hex key Torque Philips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to…
Version 1.0, April 2021 1 Multiple Inverter Backup - Application Note Version History Version 1.0 – April 2021 Introduction The multiple inverters backup (MIB) feature allows AC power stacking for on-grid and backup applications with up to three SolarEdge inverters (see Supported Inverters below). When on-grid, the inverters will work together as part of the Smart Energy Management system to…