Backup Interface Installation Checklist
1. Installation and Wiring at the Backup Interface
1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻
1.2 Check the torque of all the electrical connections inside the Backup Interface ◻
1.3 Take a photograph of the Backup Interface connection area (…
Version 1.4, July 2024
Configure and Operate Load Control Devices 1
Configure and Operate Load Control Devices —
Application Note
This application note describes how to configure load control devices and the available
operating modes for your customers.
Revision…