Version 1.2, May 2018 Application Note – Alternate Current Transformer Selection, North America Version history Version 1.2, April 2018 – product name change from "SolarEdge Electricity Meter" to "Energy Meter" Version 1.1, January 2018 – clarified CT compatibility requirements and added CT options Version 1, October 2017 – initial version Introduction The Energy Meter (refer…
Version 1.5, May 2022 1 Application Note - SolarEdge Inverter - Alternative Power Source Version History Version 1.5 (May 2022) – add note - Disabled external control functions in Alternative Power Source mode Version 1.4 (March 2020) – Update of the minimum supported CPU version for three phase inverters to 4.8.xxx Version 1.3 (January 2020) – Addition of dry/wet contacts connection diagrams…
Application Note: SolarEdge Combiner Box Use Cases There are two options available to installers when installing a battery as part of a SolarEdge system. With the Combiner Box If one or more LG Prime batteries, or three SolarEdge Home Batteries are to be connected, connect the DC cables from the battery/batteries and the Power Optimisers to the Combiner Box. Then, connect the cables from the…