Three Phase Inverter with Synergy Technology Quick Installation Guide PN: SExxK-xxxxIxxxx For Europe, APAC and South Africa Version 1.7 Scan for full installation guide DE NL FR IT S PL S E HU ZH CZ TR 7 Turn ON/OFF the AC switch of the main circuit board. When turning off, wait 5 minutes for DC Voltage to drop to safe level before removing the front panel. 8 Turn the DC Disconnect Switch on/off…
Three Phase Inverter with SetApp Configuration PN: SEXXK-XXXXIXXXX Quick Installation Guide For Europe, APAC and South Africa Version 1.3 P. 01 > EN FR NL IT DE P. 23 > PL ES CHT PT SE EN FR NL IT DE EN 1. Turn ON/OFF/P Switch to OFF (0) 2. Turn Safety Switch to OFF 3. Open cover screws FR 1. Placer le commutateur MARCHE/ARRÊT sur ARRÊT (0) 2. Placer l’interrupteur de sécurité sur ARRÊT 3.…
1 MAN-01-00615-1.2 StorEdge Interface Wiring and On Site Check Quick Guide StorEdge Interface Wiring and On-Site Check List for Single Phase Inverters with HD-Wave Technology and SetApp Configuration – for Europe, APAC and South Africa Revision History Revision 1.2 (December 2019) – Spanish translation added. Overview This document provides instructions for wiring and post-installation…
Version 1.1, January 2023 1 MAN-01-00826-1.1 DC Surge Protection Device Installation/Replacement in Three Phase Inverters with Synergy Technology DC Surge Protection Device Installation/Replacement in Three Phase Inverters with Synergy Technology P/N: SExxK-xxxxIxxxx NOTE There are two types of DC Surge Protection Device (SPD) mounting systems for Synergy Manager, Horizontal and Vertical mounting…
Case Study The Challenge When Shinfox Power renewable energy investment firm decided to finance one of the largest utility- scale PV plants in the world, they searched for a PV system with the maximum energy output and the lowest operating costs, to secure the highest long-term return on their investment. Shinfox Power, a subsidiary of the Foxlink group, develops, constructs and provides O&M…