1 Communication Board Replacement in Three Phase Inverters Kit Contents Communication board Required Tools 5mm hex key Torque Philips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5 minutes for the capacitors to…
What’s in the Package SolarEdge Home Battery 48V Used with SolarEdge inverters Quick Installation and Operation Guide for Europe Ordered Separately WARNING! Before installing or operating the SolarEdge Home Battery, read the Safety and Handling instructions at the back of this page. Drill Min 2 qualified installers Level Phillips screwdriver WARNING! This symbol denotes a hazard. It calls…