1 MAN-01-00615-1.2 StorEdge Interface Wiring and On Site Check Quick Guide StorEdge Interface Wiring and On-Site Check List for Single Phase Inverters with HD-Wave Technology and SetApp Configuration – for Europe, APAC and South Africa Revision History Revision 1.2 (December 2019) – Spanish translation added. Overview This document provides instructions for wiring and post-installation…
1 HANDLING AND SAFETY INSTRUCTIONS Version 1.3, April 2020 Safety Information WARNING! Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions are fully understood and met. CAUTION! Denotes a hazard. It calls attention to a procedure that, if not…
Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…