Backup Interface Installation Checklist
1. Installation and Wiring at the Backup Interface
1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻
1.2 Check the torque of all the electrical connections inside the Backup Interface ◻
1.3 Take a photograph of the Backup Interface connection area (…
Version 1.0, October 2025 1
SolarEdge CSS-OD 197 kWh | Transportation and Storage Guidelines
Transportation and Storage Guidelines
SolarEdge CSS-OD: Battery Cabinet 197 kWh
Version History
• Version 1.0 (October 2025) - Release
Overview
This document provides SolarEdge-certified Installers and logistics center personnel with the necessary details on the
packaging, storage, and…