1 MAN-01-00615-1.2 StorEdge Interface Wiring and On Site Check Quick Guide StorEdge Interface Wiring and On-Site Check List for Single Phase Inverters with HD-Wave Technology and SetApp Configuration – for Europe, APAC and South Africa Revision History Revision 1.2 (December 2019) – Spanish translation added. Overview This document provides instructions for wiring and post-installation…
Installation Guide StorEdge Interface For the Single Phase Inverter with HD- Wave Technology and SetApp Configuration and LG Chem Batteries Version 1.1 Contents Disclaimers 2 Important Notice 2 Emission Compliance 3 Safety Warnings 3 Revision History 4 HANDLING AND SAFETY INSTRUCTIONS 5 Safety Symbols Information 5 IMPORTANT SAFETY INSTRUCTIONS 5 Chapter 1: Overview 8 The StorEdge Solution…
Equipment: 1) Wireless Repeater 2) Wireless Gateway Brand Name: Test Model No.: WiFi-GW Applicant: SolarEdge Technologies Ltd. Test Report No.: LD190618C10A We, Bureau Veritas Consumer Products Services (H.K.) Ltd., Taoyuan Branch, declare that the equipment above has been tested in our facility and found compliance with the requirement limits of applicable standards, in accordance with the…