Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Version 1.1, March 2022 1 SolarEdge Home Battery (High Voltage) Fire Extinguisher Installion Guide SolarEdge Home Battery (High Voltage) Fire Extinguisher Installion Guide Overview This document describes how to insert and secure a fire extinguisher in an SolarEdge Home Battery. You must install the fire extinguisher as part of the Home Battery installation process. Do this directly after hanging…
Main Service Panel Backed-up Loads Panel 3 Installation and Operation Guide SolarEdge Home Backup Interface for use with the SolarEdge Home Hub Inverter – Single Phase For Australia 2 1 x 3 2 Connect Backup Interface 1. Turn off connection to grid by switching off the main circuit breaker. 2. Thread the L1, Neutral and Ground wires from the Main Service panel through the supplied ferrite bead.…