Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Replacing Safety Switch Fuses with Terminal Blocks in Three Phase Inverters This document describes how to replace the DC fuses in the Safety Switch with DC terminal blocks. The supplied DC terminal blocks support cables with 2-8 AWG cross section. Kit Contents The kit is supplied with replacement parts for 5 inverters: Five (5) pairs of terminal blocks (labeled DC+ and DC-) Five (5) pairs of red…
Version 1.1, January 2023 1 MAN-01-00826-1.1 DC Surge Protection Device Installation/Replacement in Three Phase Inverters with Synergy Technology DC Surge Protection Device Installation/Replacement in Three Phase Inverters with Synergy Technology P/N: SExxK-xxxxIxxxx NOTE There are two types of DC Surge Protection Device (SPD) mounting systems for Synergy Manager, Horizontal and Vertical mounting…