Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
Communication Board Replacement in Single Phase Inverters with HD-Wave Technology and SetApp Kit Contents Communication board Required Tools 4mm hex key Phillips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Version 1.3, February 2024 Configure and Operate Load Control Devices 1 Configure and Operate Load Control Devices — Application Note This application note describes how to configure load control devices and the available operating modes for your customers. Revision history Version 1.3, February 2024: Latest Firmware version — 4.20. Home Network and Zigbee are now compatible Version 1.2, November…