Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Revision 1.0, November 2020 1 Application Note–Backup Interface Installation Best Practices Application Note–Backup Interface Installation Best Practices Revision History Revision 1.0 - November 2020 Initial release Introduction SolarEdge’s Backup Interface is designed to create a microgrid during power outages by disconnecting the home from the grid. This application note provides information…
Application Note: Determining Power Optimizer and PV Module Compatibility based on Isc STC As of May 2020, compatibility between power optimizers and PV modules is determined based on the Isc STC value, instead of the Isc temperature coefficient of the module. This ensures that a greater range of power optimizers are compatible with various PV modules. In the example below, the PVmodule's…