Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
December 2023 1 LIMITED PRODUCT WARRANTY This SolarEdge Technologies Ltd. limited warranty (the “Limited Warranty”) covers defects in workmanship and materials of the below-listed products (“Products”) for the applicable warranty period set out below (“Warranty Period”). See Products Covered and Warranty Period. The Limited Warranty only applies to the buyer who purchased the Products from an…