1 MAN-01-00735-1.0 - RS485 over RF Module - Technical Specifications RS485 over RF Module - Technical Specifications GENERAL Part Number SEPS-WT-XBEE Description Stand-alone RF modems provide reliable wireless connectivity over a range of up to 28 miles.* PERFORMANCE UNIT Indoor/Urban range 10 Kbps: up to 2000 ft. (610 m); 200 Kbps: up to 1000 ft. (305 m) ft./m Outdoor/RF line-of-sight range 10…
1 MAN-01-00642-1.2 StorEdge Single Phase Inverter Wiring and On Site Check Quick Guide StorEdge Single Phase Inverter with HD-Wave Technology and SetApp Configuration – Wiring and On Site Check Quick Guide for Europe, APAC and South Africa Revision History Revision 1.2 (December 2019) – Spanish translation added. Overview This document provides instructions for wiring and post-installation…
Communication Board Replacement in Single Phase Inverters with HD-Wave Technology and SetApp Kit Contents Communication board Required Tools 4mm hex key Phillips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5…
Technical Note SolarEdge Products Temperature Derating Version 1.7 March 2025 MAN-01-01250-1.0 About This Technical Note summarizes the derating properties of SolarEdge Inverters and Power Optimizers. Revision history Version Date Description 1.7 March 2025 Added graph for Three Phase Inverters for VDE4110 certification 1.6 January 2025 Added SE250KUS, SE285KUS, SE285K 1.5 June 2024 Added R500…
Certificate of compliance Applicant: SolarEdge Technologies Ltd. 1 HaMada Street Herzliya 4673335 Israel Product: Inverter Model: Photovoltaic (PV) Inverter SE5000, SE6000 Battery Inverter SE5000-RWS, SE6000-RWS Use in accordance with regulations: The inverter(s) are tested according the IEC 61683:1999, EN 61683:2000, DIN EN 61683:2000 procedure for measuring efficiency. Applied rules and…
1 RS485 Surge Protection Kit Installation Guide - MAN-01-00597-1.1 Dual-Channel RS485 Surge Protection Device Plug-in for Three Phase Inverters with SetApp Configuration - Installation Guide This document describes how to install the RS485 Dual-Channel Surge Protection Device (SPD) in a SolarEdge three-phase inverter. For more information on the surge protection device, see the datasheet at:…