1 HANDLING AND SAFETY INSTRUCTIONS Version 1.3, April 2020 Safety Information WARNING! Denotes a hazard. It calls attention to a procedure that, if not correctly performed or adhered to, could result in injury or loss of life. Do not proceed beyond a warning note until the indicated conditions are fully understood and met. CAUTION! Denotes a hazard. It calls attention to a procedure that, if not…
Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
SolarEdge Energy Bank FAQs Q: Which cell technology does SolarEdge Energy Bank use? A: Energy Bank is based on Li-ion NMC and is compliant with advanced safety ratings, such as UL1642, UL9540, UL1973, UN38.3, & has been tested to UL9540A. Q: What is Energy Bank’s usable energy capacity? A: 9.7kWh (100% depth of discharge). Q: What is Energy Bank’s round-trip efficiency? A: 94.5% Q: How much…