Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Installation Guide StorEdge Interface For the Single Phase Inverter with HD- Wave Technology and SetApp Configuration and LG Chem Batteries Version 1.1 Contents Disclaimers 2 Important Notice 2 Emission Compliance 3 Safety Warnings 3 Revision History 4 HANDLING AND SAFETY INSTRUCTIONS 5 Safety Symbols Information 5 IMPORTANT SAFETY INSTRUCTIONS 5 Chapter 1: Overview 8 The StorEdge Solution…
Limited Product Warranty SolarEdge Home Battery 48V Subject to the terms of this SolarEdge Home Battery 48V Limited Product Warranty (“Limited Warranty”), SolarEdge Technologies Ltd. (“SolarEdge”) shall cover defects in (i) workmanship and materials; and (ii) Energy Retention (as defined below) of the SolarEdge Home Battery 48V (“SolarEdge Home Battery”) for the Warranty Period set out below: The…