www.solaredge.com | info@solaredge.com ExamplE: In the example, 11 blocks are affected, resulting in a ~11% reduction in system output due to the shading object: SF = 1 - (11*0.01) = 1 – 0.11 = 0.89 MCS Shade Procedure & the SolarEdge Advantage The MCS Shade Evaluation Procedure1 is a method for installers to present decent evaluation of the shading effect on the performance of solar systems…
ECI Telecom Ltd. 30 Hasivim St P.O 500, Petah-Tikva 49517 Israel Tel: 972-3-9268810/9266170 Fax: 972-3-9268811 www.qualitech.co.il Doc Identity Certificate of Compliance Date of Issue 20/15166 29/07/2021 Product: POWER OPTIMIZER Model: S followed by 001 to 1200 may be followed by A or B. Test Date: 16/12/2020 This is to certify that the product specified herein has been tested and found compliant…
QualiTech EMC Laboratory 30 Hasivim Street, Petah-Tikva, 49517, Israel Product name Power Optimizer Sxxx (Where xxx is any number, 0-9 to a maximum up to xxx=500) A sample of the above product has been tested by our Laboratory in January - February 2022 and found to be compliant with relevant sections of the following standard: ---------------------------------------------------- Certificate 1633…