Skip to main content
Centro de formación Centro de formación

Header Menu Spanish

  • Volver al sitio web
  • Global- EN Global- EN
    • You are currently visiting
    • Global site
      Global – English
    • North America
      United States – English
    • South America
      Brazil – Português
    • Europe
      Germany – Deutsch
      Italy – Italiano
      Netherlands – Nederlands
      Poland – Polski
      Sweden – Svenska
      Spain – Español
      UK – English
      France - French
    • Asia Pacific
      Australia – English
      Japan – 日本語
      Taiwan – 繁體中文

Cómo podemos ayudarle?

clear

Producto

Tipo de documento

  • (-) Estudios de casos
  • Certificaciones
  • Declaraciones
  • Declaraciones sobre la política
  • Fichas técnicas
  • Folletos
  • Garantías
  • Guía rápida de instalación
  • Guías de servicio y asistencia
  • Manual de instalación
  • Notas técnicas y de aplicación
  • Términos y condiciones
  • User Guide

Tipo de activo

  • ​​​​​​​​​Herramientas de marketing

País

  • (-) África
  • Europe
    • Italia
  • Asia y Oriente Medio
    • Taiwán
    • Japón
  • Norteamérica
    • México
  • Sudamérica
  • Pacífico sur
    • Australia

Idioma

  • Inglés
4 resultados encontrados
  • Africa
  • Case Studies
  • Clear all
    • Estudios de casos
    Floating PV system inSouth Africa
    Case Study The Marlenique Estate is a picturesque fruit farm and wedding venue in Western Cape. Over the past few years, the farm has been affected by rising energy prices. Powering irrigation pumps, the packhouse, cold storage, and the wedding venue has resulted in direct production costs to escalate above sales revenue. Adding to the energy burden was the impact of load shedding, and the ever-…
    descargar
    compartir
    01 Dec 2022
    • Estudios de casos
    First StorEdge® and LG Chem installation inSouth Africa
    Case Study Cable theft is a common problem in South Africa. Apart from the disruption to transport, water and telecommunications, it causes power outages leaving homes and businesses without electricity and working security alarms. Dr. Chetty decided to install an energy storage solution in his home because of the high frequency of electricity outages due to the cable theft in the area. SolarEdge…
    descargar
    compartir
    01 Dec 2022
    • Estudios de casos
    SolvingSouth Africa’s Interrupted Power Supply Problem with SolarEdge/Victron Integration
    Case Study Solving South Africa’s Interrupted Power Supply Problem with SolarEdge/Victron Integration The Challenge Rotational load shedding has become a way of life in South Africa since December 2014. Scheduled periodic blackouts, intended to relieve some of the pressure on the country’s aging electric utility infrastructure, are having a devastating impact on the economy. The good news is that…
    descargar
    compartir
    01 Dec 2022
    • Estudios de casos
    SolarEdge Case study,984kW,Volkswagen,South Africa
    www.solaredge.com | info@solaredge.com CASE STUDY Volkswagen Group South Africa (VWSA) used SolarEdge technology for its first Solar PV installation on the rooftop of its Engine Plant. The primary driver for VWSA to invest in a solar installation was to offset the electricity expenses incurred in operating the manufacturing plant on a three- shift basis. Increasing energy stability, and reducing…
    descargar
    compartir
    01 Dec 2022

Volver al principio

¿Necesita más ayuda?

Visite nuestro Centro de Asistencia

Centro de Asistencia

Visitar también

  • Centro de formación

Footer Menu Spanish

  • Política de privacidad
  • Términos y condiciones