Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
Limited Warranty for Monocrystalline PERC Panel with Split Cell Technology This Limited Warranty is suitable for the following SolarEdge Modules SPVxxx-R60LWMG xxx = 355-375 [W] SPVxxx-R60LBMG xxx = 345-365 [W] SolarEdge is committed to the following quality performance warranty for the Monocrystalline PERC Panel with Split Cell Technology (the “Products”). The Product Warranty Term is 144 months…