1 MAN-01-00734-1.0 - Site Power Controller - Technical Specifications Site Power Controller - Technical Specifications Part Number SE2000-PFSV-MSDC Description Site power controller provides dynamic control of site power, active power & reactive power Inputs / Outputs UNIT AI 4 independent analog input channels (can be configured as voltage or current input) DI / DO 8 digital inputs / 8…
1 MAN-01-00735-1.0 - RS485 over RF Module - Technical Specifications RS485 over RF Module - Technical Specifications GENERAL Part Number SEPS-WT-XBEE Description Stand-alone RF modems provide reliable wireless connectivity over a range of up to 28 miles.* PERFORMANCE UNIT Indoor/Urban range 10 Kbps: up to 2000 ft. (610 m); 200 Kbps: up to 1000 ft. (305 m) ft./m Outdoor/RF line-of-sight range 10…
Communication Board Replacement in Single Phase Inverters with HD-Wave Technology and SetApp Kit Contents Communication board Required Tools 4mm hex key Phillips screwdriver 3mm flat screwdriver Removing the Inverter Cover If the inverter cover is not already removed, use the following procedure for cover removal. To remove the inverter cover 1. Turn the inverter ON/OFF/P switch to OFF. Wait 5…
Technical Note SolarEdge Products Temperature Derating Version 1.7 March 2025 MAN-01-01250-1.0 About This Technical Note summarizes the derating properties of SolarEdge Inverters and Power Optimizers. Revision history Version Date Description 1.7 March 2025 Added graph for Three Phase Inverters for VDE4110 certification 1.6 January 2025 Added SE250KUS, SE285KUS, SE285K 1.5 June 2024 Added R500…
Version 1.1, April 2023 1 SolarEdge Combiner Box Installation and Connection SolarEdge Combiner Box Installation and Connection Product Number CMBN-6K and CMBN-10K Revision History Version 1.1 (April 2023) • LG battery removed Version 1.0 (October 2021) • Initial release WARNING! Before installing and connecting the combiner box to the inverter and other equipment, read carefully all handling and…