Version 1.2, August 2020 Interval Consumption Data File Upload to Designer Version History Version 1.2 (August 2020) – added How to Convert a File with a Single Column to the Supported Format Version 1.1 (April 2020) – added interval column to file Version 1.0 (Feb 2020) – Initial release Introduction In addition to the predefined consumption profiles, Designer now allows users to upload interval…
Designer Financial Analysis and Reports Introduction The SolarEdge Designer application's Financial Analysis features provide installers with the ability to accurately forecast the system costs and future financial rewards from which customers can expect to benefit after installing SolarEdge PV systems and products. After reviewing this section you will be familiar with the way: The…
Nota Técnica sobre os Efeitos do Diodo de By-pass em Condições de Sombreamento Introdução Os diodos de by-pass são uma adição padrão em qualquer módulo fotovoltaico cristalino. A função do diodo de by-pass é eliminar o fenômeno hot-spot que pode danificar as células FV e até mesmo causar incêndio se a luz que atinge as células FV em um módulo não for uniforme. Os diodos de by-pass são geralmente…
v.1.2, April 2021 SolarEdge Recommended AC Wiring – Application Note SolarEdge Recommended AC Wiring – Application Note This note recommends the appropriate AC wire size for connecting the SolarEdge inverter AC output to the utility grid. In some PV installations, the wiring between the inverter AC output and the utility grid connection point covers large distances. In these cases, wire size…
Version 3.0, March 2021 1 Application Note - How to Design a SolarEdge System Using PV*SOL Application Note - How to Design a SolarEdge System Using PV*SOL This application note describes how to simulate a SolarEdge system in PV*SOL. NOTE This application note assumes the reader has prior knowledge of the basic use of PV*SOL. NOTE Although PV*SOL performs basic SolarEdge design validation, it is…
Version 1.0, June 2021 1 Upload Guidelines for Multiple Serial Number Barcodes Background to Mapping with Barcode Stickers As part of the SolarEdge installation process, mapping the location of Power Optimizer serial numbers on site is required. This is to ensure that the correct system data is transferred to the Monitoring Platform based on the accurate location of each Power Optimizer. There…