Installation Guide Communication Options Version 1.4 Version 1.4 November 2023 1 Revision History Version 1.4 (November 2023) Removed regions (heading- Chapter 5) Version 1.2 (February 2018) Changed SolarEdge Logger to Non-SolarEdge Logger in figure 'multiple inverters, RS485 bus, RS485-E, wired Ethernet (LAN) , non SE logger and modified procedure in SE Inverters Configuration after the…
Application Note - Installing Frame-Mounted Power Optimizers Introduction Frame-mounted power optimizers are mounted directly on the module frame in rail-less racking systems. Mounting the power optimizers in advance saves installation time. You can mount the power optimizer at any point of the frame. The supported module frame cross-section is 1.1-2.2 mm/ 0.04-0.09 in. Figure 1: Frame Dimensions…