Backup Interface Installation Checklist 1. Installation and Wiring at the Backup Interface 1.1 Check the torque of all the securing bolts for the mounting bracket and conduit holder. ◻ 1.2 Check the torque of all the electrical connections inside the Backup Interface ◻ 1.3 Take a photograph of the Backup Interface connection area (useful for future debugging, if necessary). ◻ 1.4 If required,…
`1 2 B. Install the circuit breaker 3 OFF Main Service Panel 1 5 OFF 2 Main breaker switch applicable for BI-E only OFF 3 17 in*lbs 23 in*lbs 6 A. Power off the system and open the Backup Interface Inverter Circuit Breaker Installation for connecting an additional inverter to the Backup Interface (BI-N and BI-E models) ELECTRICAL SHOCK HAZARD C. Mount the dead front D. Connect an additional…
QualiTech EMC Laboratory 30 Hasivim Street, Petah-Tikva, 49517, Israel Product name SolarEdge Home Dry Contact Switch A sample of the above product has been tested by our Laboratory in September 2022 and found to be compliant with relevant sections of the following standard: ---------------------------------------------- ------ Manufactured by SolarEdge Technologies Ltd. 1 HaMada Street,…
Certificate of Compliance Product Name ……..………………………………: Home Load Controller. Model Name………………………………………...: DCS. Applicant………………………………………….…: SolarEdge Technologies Ltd. 1 HaMada Street, Herzeliya 4673335, Israel Tel: +972-9-9576620. Test Report Reference ………………………….:EMC06092022 rev2 Certificate No……………………………………..:COC06092022 rev2 Standards………………………………………….: EN 55011:2016/A11:2020 EN 61000-6-3:…